HDinis09 Posted October 5, 2020 Share Posted October 5, 2020 I built a raft to go get some 1 anky on herbivore island, and when i came back i came across a problem: The Dino simply doesn't enter it, i have seen a source on Dododex, that he requires at least a 2x2 to pass, however this is not happening when encountering ceilings. In the provided photo, he did pass the space without the ceiling, but when he came across the ceiling section, he got blocked. So my question is, in a wall that is 2 tiles high, does putting a ceiling make is somehow smaller? And is there a way for me to go around this without having a 3 walls(raft view gets blocked when building is too high) Image Thank you Link to comment Share on other sites More sharing options...
Thyme Posted October 5, 2020 Share Posted October 5, 2020 What you could do is lower the foundations one more time than a pillar, and attach the ceiling to the pillar. The ceiling will be just a smidge higher Link to comment Share on other sites More sharing options...
Zapha Posted October 5, 2020 Share Posted October 5, 2020 From my experience an Anky needs 3 height, not only 2. Keep also in mind that it's better to transport dinos one wall higher than the base height of the raft, or the dino will be pulled of your raft from any rock or branch near the water surface. Link to comment Share on other sites More sharing options...
millwight Posted October 5, 2020 Share Posted October 5, 2020 I would recommend just using a dino gate you can only place 88 structures on a wooden raft. Link to comment Share on other sites More sharing options...
HDinis09 Posted October 9, 2020 Author Share Posted October 9, 2020 On 10/5/2020 at 4:50 PM, Thyme said: What you could do is lower the foundations one more time than a pillar, and attach the ceiling to the pillar. The ceiling will be just a smidge higher I have tried this, maintaining the first pillar height, and then lowering all foundations by one, but without success! I have tried to repeat this same procedure 3 other times, without luck(maybe i'm repeating a mistake?). However what did work(still glitchy)was: -Lower foundations the max you can; -Add 2 height wall and ceiling; The Anky was able to squeeze through, it seemed like he wouldn't pass but with a little angle work it managed. Thank you all for your replies! Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.